Aluminum alloy tubes are used for irrigation purposes to transport water from one place to another efficiently. These tubes are welded and should be strong, lightweight, and corrosion-resistant to increase their lifespan.
The tubes must follow up with the IS: 7092 (Part 1): 1992 standard, which includes their composition, strength, and size. BIS certification is required to check the tubes and their manufacturing process to ensure that they meet the standard requirements.
Overview of IS 7092 (Part 1): 1992
This standard defines the requirements for welded aluminum alloy irrigation tubes. It defines the key parameters to ensure quality and appropriate use.
- Chemical Composition: Ensures the right alloy is mixed for strength and durability
- Mechanical Properties: Checks the strength and ability to handle pressure
- Dimensions and Tolerances: Ensures proper size and fit with irrigation systems
- Surface Finish: Protects tubes from damage and environmental effects
Meeting these parameters is crucial for obtaining ISI Certification for Aluminium Alloy welded Tubes for Irrigation Purposes and ensuring reliable performance in irrigation systems.
testing and inspection requirements
To maintain the quality and reliability of aluminium alloy welded tubes, IS 7092 (Part 1): 1992 defines specific testing and inspection practices. These checks are carried out at different stages of production to ensure that every tube meets the required standards.
workmanship & surface finish
Tubes must be free from defects such as cracks, dents, or rough surfaces. Continuous inspection during manufacturing ensures a smooth finish and consistent quality throughout production.
chemical composition check
The chemical composition is verified to ensure the correct aluminium alloy is used. This testing is carried out for each raw material batch (heat). It may be conducted at BIS-approved laboratories (S), and if the raw material is already ISI marked, re-testing may not be required.
mechanical strength test
To ensure durability and performance, the following tests are conducted on each production batch (control unit):
- Tensile Strength Test: Checks the strength of the tube
- Flattening Test: Ensures the tube can withstand deformation without cracking
Both tests are required to be performed within the factory (R).
hydrostatic pressure test
This test verifies the tube’s ability to withstand internal pressure without leakage. It is conducted on every single tube, making it one of the most critical safety checks. This test must be performed in the factory (R).
dimensions & tolerances
The diameter, thickness, and overall size of the tubes are checked regularly during production. Continuous monitoring ensures proper fitting and compatibility in irrigation systems.
in-house testing requirements
Some tests must be conducted within the factory, while others can be performed at BIS-approved laboratories:
- R (Required): Test must be done in-house
- S (Subcontracting Allowed): Test can be outsourced
Importance of These Checks
These inspection and testing practices help in:
- Maintaining consistent product quality
- Reducing defects during production
- Ensuring compliance with BIS standards
- Allowing only approved products to carry the ISI mark
bis certification process for aluminium alloy tubes for irrigation purposes(welded tubes)
The process of getting BIS certification involves various steps that are taken to ensure that these tubes are manufactured as per the Indian Standard. These steps are as follows:
- Online Registration: The first step in getting BIS certification is to register on the Manak portal, BIS’s online platform. Manufacturers need to create an account, fill in company details, and provide information about the product and manufacturing process. They also have to upload supporting documents like technical specifications and test reports. For foreign manufacturers, a hard copy of the application and documents must be sent to the BIS office, and an Authorized Indian Representative (AIR) should be appointed to handle communications.
- Testing at BIS-Approved Laboratory: The next step is to conduct testing on samples of Aluminium Alloy Tubes at a laboratory that has been approved by the BIS.
- Application Submission: The application along with test reports, supporting documents, and KYC needs to be sent to the BIS. In addition to this, a nomination process needs to be done for foreign manufacturers, along with sending an official communication.
- Factory Inspection: The officials from BIS inspect the manufacturing unit to check:
- Manufacturing process
- Raw material details
- Factory layout
- In-house testing facilities
- Quality control measures
- Grant of BIS License: After successful verification of documents and test reports, the license is issued by BIS. In the case of foreign manufacturers, the confidential test report is sent to the Foreign Manufacturers Certification Department. After verification, the license is granted.
Document required for bis certification
The following documents are typically required for obtaining BIS Certification:
| Category | Details Required |
|---|
| Basic Details | - GST Certificate
- Email ID & Contact Number
- Factory & Office Address
- Rent Agreement / Lease Deed (if applicable)
|
| Legal Documents | - Partnership Deed (if partnership firm)
|
| Manufacturing Details | - List of Machinery
- Process Flow Chart
- Layout Plan of Factory
|
| Raw Material Details | - List of Raw Materials
- Supplier Details
- Raw Material Invoices
- Raw Material Test Certificates
|
| Testing & Quality Control | - List of Testing Equipment
- Calibration Certificates
- QC / Lab In-charge Appointment Letter & Qualification
|
| Production Details | - Annual Installed Capacity
- Last Year Production Value
|
| Product & Packaging Details | - Quantity per Package
- Nature of Packing
- Nature of Printing / Marking on Product
|
| Management Details | - Top Management Details
- Concerned Person for BIS Communication
|
| Brand & Certification Documents | - Trademark / Brand Certificate
- Consent Letter from BIS Recognized Laboratory
|
| Additional Documents | - Weekly Off Details
- Hygiene Document (if applicable)
- Relaxation Letter (if applicable)
- Any Other Relevant Document
|
Foreign manufacturers must additionally appoint an Authorized Indian Representative (AIR) to coordinate with the Bureau of Indian Standards (BIS) and manage compliance requirements in India.
Note:-
Foreign manufacturers must appoint an Authorized Indian Representative (AIR) to coordinate with the Bureau of Indian Standards (BIS) and handle compliance, documentation, and communication in India.
Key Requirements for Certification
To obtain ISI Certification manufacturers must fulfill the following:
- The applicant must be the manufacturer (not a trader or distributor)
- Availability of proper manufacturing and testing infrastructure
- In-house quality control and testing facilities
- Compliance with all specifications under IS 7092 (Part 1): 1992
Foreign manufacturers must appoint an Authorized Indian Representative (AIR) to apply for BIS Registration for Aluminium Alloy Tubes for Irrigation Purposes (Welded Tubes).
Marking Requirements & License Validity: IS 7092 (Part 1)
For Aluminium Alloy Welded Tubes (Irrigation), marking and validity follow strict protocols to ensure field safety and regulatory compliance.
Marking Requirements
Once certified, the ISI Mark must be clearly and indelibly applied to each tube. The marking ensures the product meets the pressure and material standards of IS 7092 (Part 1): 1992.
Mandatory Marking Elements:
- Standard Number: IS 7092 (Part 1)
- ISI Logo: The official Bureau of Indian Standards mark.
- CM/L Number: The unique 7 or 8-digit license number.
- Manufacturer’s ID: Name or registered trademark.
- Technical Specs: Tube size (outer diameter and wall thickness) and alloy designation.
- Traceability: Batch or lot number and date of manufacture.
Note: Marking is typically done via embossing or high-contrast inkjet printing at regular intervals along the length of the tube
validity of bis license
- Initial Validity: 1 to years (depending on the application types)
- Renewal: Must be renewed before expiry via application and fee payments.
- Surveillance: Perioic factory audits and market sample testing by BIS.
- Compliance: Strict adherence to IS 7092(Part 1):1992 and the latest Quality Contol Orders(QCO).
- Risk: Non-compliance or failed samples may leads to license suspension or cancellation.
BIS Certification Cost
The cost of getting BIS certification for aluminium alloy extruded tubes includes fees for the application, inspection, license, testing, and marking. These charges must be paid to BIS according to Scheme-I guidelines.
cost breakdown
| S. No. | Particular | Amount (INR) | Remarks |
|---|
| 1 | Application Fee | 1000 | To be paid to BIS |
| 2 | Audit / Inspection Fee | 7000 | To be paid to BIS |
| 3 | License Fee | 1000 | To be paid to BIS |
| 4 | Sample Testing Fee | As applicable | Varies by product and lab |
| 5 | Minimum Advance Marking Fee | As applicable | Depends on production and standard |
| 6 | Renewal Fee | 1000 | To be paid to BIS |
| 7 | Inclusion Fee | 5000 | To be paid to BIS |
| 8 | Service Fee | As applicable | Consultant charges |
Note:
- Additional costs such as pre-inspection (factory visit) may apply to verify compliance
- Final cost may vary depending on product type, testing requirements, and BIS guidelines
marking fee (as per manak portal reference - is 7092)
Note: This marking fee is based on Manak portal reference data. Actual marking fee may vary depending on the applicable part of production volume, and current BIS guidelines.
Conclusion
BIS certification under IS 7092 (Part 1): 1992 ensures that aluminium alloy welded tubes used in irrigation meet quality, safety, and performance standards. It considers key aspects like material quality, testing, marking requirements, and adherence to BIS guidelines, helping manufacturers provide reliable and compliant products in the Indian market.
Managing the certification process involves several steps, including documentation, testing, inspection, and approval. By working with an experienced BIS Consultant for Aluminium Alloy Tubes for Irrigation Purposes (Welded Tubes) like EVTL INDIA, manufacturers can simplify the process, obtain certification efficiently, and maintain compliance without delays.