Manufacturers
Producing Gas Welding Equipment in India
Quality Control Order (QCO) Update

Quality Control Order (QCO) Update
The Government of India issues this Quality Control Order to ensure safety, reliability, and standardization of Gas Welding Equipment across the country.
Important update regarding the Indian Standard applicable to all existing licence holders, new applicants, manufacturers, importers, distributors, and sellers of Gas Welding Equipment.
Producing Gas Welding Equipment in India
Importing Gas Welding Equipment into India
Selling or distributing Gas Welding Equipment in India
Existing license holders and new applicants
The Ministry of Commerce and Industry, Department for Promotion of Industry and Internal Trade (DPIIT), Government of India, has issued the draft Gas Welding Equipment (Quality Control) Order, 2025.
Under this notification, Gas Welding Equipment covered under IS 6901:2018 have been brought under mandatory BIS certification requirements.
As per the notification, manufacturers of Gas Welding Equipment shall ensure that their products conform to the specified Indian Standard and bear the Standard Mark (ISI Mark) under a valid BIS licence granted in accordance with Scheme-I of Schedule-II of the BIS (Conformity Assessment) Regulations, 2018.
IS 6901:2018 is the Indian Standard for Gas Welding Equipment — Pressure Regulators and Pressure Regulators with Flow-Metering Devices for Gas Cylinders Used in Welding, Cutting and Allied Processes up to 300 bar (30 MPa).
The standard specifies the requirements relating to design, construction, materials, performance, safety, testing, inspection, marking, and quality control of pressure regulators and flow-metering devices used with gas cylinders in welding and cutting operations.
The standard ensures that gas welding equipment meets prescribed quality, safety, pressure regulation, leak resistance, durability, operational reliability, and performance requirements for safe and efficient use in welding workshops, fabrication units, metal processing industries, manufacturing facilities, maintenance operations, and allied industrial applications.
The Quality Control Order will come into force from the following dates:
| Category | Implementation Timeline |
| General (Other than Micro and Small Enterprises) | 6 months from the date of notification in e-Gazette |
| Small Enterprises | 9 months from the date of notification in e-Gazette |
| Micro Enterprises | 12 months from the date of notification in e-Gazette |
The Bureau of Indian Standards (BIS) shall act as the certification and enforcement authority for Gas Welding Equipment covered under this Quality Control Order.
Any person or manufacturer violating the provisions of this Order shall be punishable under the provisions of the Bureau of Indian Standards Act, 2016.
| Title | Issue Date | View Order |
| QCO Order | 08/07/2025 | View |
The QCO does not apply to:
| Title | Issue Date | View Order |
|---|---|---|
| Issue Order | 2025-07-08 | Click Here |

Certification Authority: Bureau of Indian Standards (BIS)
Applicable Standard: IS 6901: 2018

Manak Bhawan 9, B.S. Zafar Marg,
New Delhi - 110002
+91-11-23231903
pgd@bis.org.in
To be announced
The contents provided in this update are solely meant for general informational purposes. Before you make decisions or take action based on the information provided, it is advised to seek professional legal consultation.